Major maintenance provision (voorziening groot onderhoud)
Under conditions, a provision for major maintenance spreads the costs of periodic major maintenance through the annual accounts.
What does major maintenance provision (voorziening groot onderhoud) mean?
Under conditions, a provision for major maintenance spreads the costs of periodic major maintenance through the annual accounts.
The treatment depends on the permitted method chosen and the nature of the asset. A future plan alone is not enough to book a liability arbitrarily.
How does it work?
The legal basis is the second sentence of art. 2:374(1) DCC: a provision may be formed against expenditure in a following financial year that originates partly before the end of the financial year, in order to spread costs evenly. RJ 212 permits two treatments: include the costs of major maintenance in the carrying amount of the asset, or run them through a maintenance provision. The third possibility, charging directly to the result, has been deleted from the Richtlijn, also in the RJk volume.
If you choose the provision, you build it up per maintenance component, from the estimated amount and the period between two rounds of work. At the time of the maintenance the full amount should have been built up; if the actual costs differ, the difference goes to the profit and loss account. Replacing a major component is not major maintenance but an investment that is capitalised (Ten Geleide RJ volume).
Example
A BV owns a business premises whose exterior painting costs € 40,000 every five years. It chooses a maintenance provision and adds 40,000 / 5 = € 8,000 per year. After four years there is € 32,000. In year five the painting costs € 43,000: that year’s addition brings the provision to € 40,000, which is used in full; the remaining € 3,000 is a cost of year five. Then the build-up starts again, now with 43,000 / 5 = € 8,600 per year.
In the annual accounts
Provision on the liabilities side and cost in the P&L; policy in the notes.
Difference from the component approach
With the component approach, the expenditure for major maintenance is capitalised at the moment it is incurred and then depreciated until the next round: the cost follows the expenditure. With the provision, the cost precedes the expenditure. Over the whole cycle the result is the same, the balance sheet is not.
Common mistakes
- Reserving for ordinary daily maintenance
- Changing method every year without explanation
What to watch for
- Prepare a multi-year maintenance plan per building or installation with amounts and years.
- For tax there is a separate equalisation reserve for periodic maintenance of business assets; the commercial and tax positions can therefore differ.
- Micro and small entities have the same choice (RJk volume, chapter B2); medium-sized and large entities explain the provision separately and state which part is long-term (art. 2:374(3) DCC).
Legal basis and sources
art. 2:374 DCC; RJ 212
Frequently asked questions
Is a major maintenance provision mandatory?
No. It is one of the two permitted treatments; the other is capitalising and depreciating the maintenance costs.
May the provision be used for a new central heating installation?
Not if the installation is a component that is being replaced. That is a replacement investment, which is capitalised and depreciated over its own useful life.
Read more